We are in need of someone to take over the maintenance of the MMB. Yosef has done it for a long time, and we are grateful for all he has done, but life happens and he no longer has the time to devote to its upkeep. If anyone here is interested in helping to keep the board running, please let me know via DM.
Across From Holmes
-
- Posts: 2663
- Joined: Sat Aug 11, 2012 9:53 am
- School: Appalachian State
- Location: High Point
- Has thanked: 1819 times
- Been thanked: 1013 times
Across From Holmes
What are they doing across from the Convocation Center?
https://www.resortcams.com/webcams/app- ... on-center/
https://www.resortcams.com/webcams/app- ... on-center/
- appdaze
- Posts: 4766
- Joined: Thu Jun 21, 2007 7:08 pm
- Has thanked: 92 times
- Been thanked: 1737 times
- RankinApp
- Posts: 3108
- Joined: Sun Oct 03, 2004 6:33 pm
- School: Appalachian State
- Has thanked: 136 times
- Been thanked: 225 times
Re: Across From Holmes
That actually makes a lot of sense to keep pedestrians separate from traffic exiting the parking deck.
I was going to suggest a hole for folks to toss their NIL money into, but it's probably not that.

- firemoose
- Posts: 8268
- Joined: Sat Feb 18, 2012 3:20 am
- School: Appalachian State
- Location: Boone, NC
- Has thanked: 919 times
- Been thanked: 3939 times
Re: Across From Holmes
There's some issues with the steam system and they are having to replace parts of it.
Background
The Hill Street Steam Vault Replacement Project is being conducted by Appalachian State University. This project aims to enhance its infrastructure and ensure the reliability of its steam distribution system. It is designed to replace the existing steam vault to improve operational efficiency and safety.
Work Details
The contract involves the construction work required for the replacement of the Hill Street Steam Vault. Specific tasks include:
- Demolition of the existing steam vault
- Excavation
- Installation of new steam vault components
- Restoration of the site post-construction
Background
The Hill Street Steam Vault Replacement Project is being conducted by Appalachian State University. This project aims to enhance its infrastructure and ensure the reliability of its steam distribution system. It is designed to replace the existing steam vault to improve operational efficiency and safety.
Work Details
The contract involves the construction work required for the replacement of the Hill Street Steam Vault. Specific tasks include:
- Demolition of the existing steam vault
- Excavation
- Installation of new steam vault components
- Restoration of the site post-construction
- APPdiesel
- Posts: 2684
- Joined: Thu Jul 16, 2015 5:53 pm
- School: Appalachian State
- Has thanked: 821 times
- Been thanked: 1517 times
- Contact:
Re: Across From Holmes
It’s a new ultra exclusive VIP parking garage. Big enough to park 6 cars in.
Sports talk host & content creator on The Fan Upstate, 97.7 FM Greenville/97.1 FM Spartanburg/FREE AUDACY APP.
http://www.twitter.com/dieselonradio
http://www.twitter.com/dieselonradio
-
- Posts: 3392
- Joined: Mon Nov 26, 2007 2:03 pm
- Has thanked: 1373 times
- Been thanked: 525 times
-
- Posts: 5885
- Joined: Sun Dec 22, 2019 9:32 am
- School: Appalachian State
- Has thanked: 2250 times
- Been thanked: 3882 times
Re: Across From Holmes
It would have been nice if they had a new underground tunnel at that spot.
Today I Give My All For Appalachian State!!
#FreeMillerHillForMoMoney!!
#FreeMillerHillForMoMoney!!