Across From Holmes
-
BUTCH1991
- Posts: 2767
- Joined: Sat Aug 11, 2012 9:53 am
- School: Appalachian State
- Location: High Point
- Has thanked: 1953 times
- Been thanked: 1082 times
Across From Holmes
What are they doing across from the Convocation Center?
https://www.resortcams.com/webcams/app- ... on-center/
https://www.resortcams.com/webcams/app- ... on-center/
- appdaze
- Posts: 4832
- Joined: Thu Jun 21, 2007 7:08 pm
- Has thanked: 93 times
- Been thanked: 1784 times
- RankinApp
- Posts: 3118
- Joined: Sun Oct 03, 2004 6:33 pm
- School: Appalachian State
- Has thanked: 145 times
- Been thanked: 247 times
Re: Across From Holmes
That actually makes a lot of sense to keep pedestrians separate from traffic exiting the parking deck.
I was going to suggest a hole for folks to toss their NIL money into, but it's probably not that.

- firemoose
- Posts: 8287
- Joined: Sat Feb 18, 2012 3:20 am
- School: Appalachian State
- Location: Boone, NC
- Has thanked: 950 times
- Been thanked: 3982 times
Re: Across From Holmes
There's some issues with the steam system and they are having to replace parts of it.
Background
The Hill Street Steam Vault Replacement Project is being conducted by Appalachian State University. This project aims to enhance its infrastructure and ensure the reliability of its steam distribution system. It is designed to replace the existing steam vault to improve operational efficiency and safety.
Work Details
The contract involves the construction work required for the replacement of the Hill Street Steam Vault. Specific tasks include:
- Demolition of the existing steam vault
- Excavation
- Installation of new steam vault components
- Restoration of the site post-construction
Background
The Hill Street Steam Vault Replacement Project is being conducted by Appalachian State University. This project aims to enhance its infrastructure and ensure the reliability of its steam distribution system. It is designed to replace the existing steam vault to improve operational efficiency and safety.
Work Details
The contract involves the construction work required for the replacement of the Hill Street Steam Vault. Specific tasks include:
- Demolition of the existing steam vault
- Excavation
- Installation of new steam vault components
- Restoration of the site post-construction
- APPdiesel
- Posts: 2706
- Joined: Thu Jul 16, 2015 5:53 pm
- School: Appalachian State
- Has thanked: 828 times
- Been thanked: 1528 times
- Contact:
Re: Across From Holmes
It’s a new ultra exclusive VIP parking garage. Big enough to park 6 cars in.
Sports talk host & content creator on The Fan Upstate, 97.7 FM Greenville/97.1 FM Spartanburg/FREE AUDACY APP.
http://www.twitter.com/dieselonradio
http://www.twitter.com/dieselonradio
-
fjblair
- Posts: 3449
- Joined: Mon Nov 26, 2007 2:03 pm
- Has thanked: 1458 times
- Been thanked: 570 times
-
BambooRdApp
- Posts: 6436
- Joined: Sun Dec 22, 2019 9:32 am
- School: Appalachian State
- Has thanked: 2495 times
- Been thanked: 4296 times
Re: Across From Holmes
It would have been nice if they had a new underground tunnel at that spot.
Today I Give My All For Appalachian State!!
#FreeMillerHillForMoMoney!!
#FreeMillerHillForMoMoney!!