    There is some good a stuff in this link for request for design/build of addition to Peacock Hall and renovation of Edwin Duncan. The projects were recently combined into one project rather than two. There are drawings of new parking deck and elimination of the Peacock parking lot. Download the first pdf link to view:

    https://pdc.appstate.edu/rfps

    All of campus is really going to be beautiful. Less asphalt is fantastic.

    mike87
    Posts: 1266
    Joined: Tue Sep 01, 2015 8:55 pm
    School: Appalachian State
    Has thanked: 1270 times
    Been thanked: 1068 times

    Re: Next phase campus transformation

    Unread post by mike87 » Thu May 19, 2022 7:26 am

    HighlandsApp wrote:
    Thu May 19, 2022 7:04 am
      There is some good a stuff in this link for request for design/build of addition to Peacock Hall and renovation of Edwin Duncan. The projects were recently combined into one project rather than two. There are drawings of new parking deck and elimination of the Peacock parking lot. Download the first pdf link to view:

      https://pdc.appstate.edu/rfps

      All of campus is really going to be beautiful. Less asphalt is fantastic.
      Completion in May of 25. That's pretty impressive. Thanks for posting!

      User avatar
      McLeansvilleAppFan
      Posts: 9208
      Joined: Sun Dec 03, 2006 7:37 am
      School: Appalachian State
      Location: Greensboro (McLeansville) NC
      Has thanked: 4148 times
      Been thanked: 2093 times

      Re: Next phase campus transformation

      Unread post by McLeansvilleAppFan » Thu May 19, 2022 8:34 am

      That New River Light and Power parking lot refurbishment is going to turn the campus upside down.

      Seriously, the ice melt system will be nice.
      This is my very generic signature added to each post.

      User avatar
      beav910
      Posts: 511
      Joined: Wed Dec 17, 2014 9:13 pm
      School: Appalachian State
      Has thanked: 76 times
      Been thanked: 162 times

      Re: Next phase campus transformation

      Unread post by beav910 » Thu May 19, 2022 8:49 am

      I also see they've got a renovation planned for Wey Hall. Holy sh*t it needed it. That's where most of my classes were and it was pretty much a dump but I loved it. 15 million to do it is pretty crazy though. Interested to see how it turns out.
      Appalachian State Alumnus :: Graphic Designer

      HighlandsApp
      Posts: 1297
      Joined: Tue Apr 01, 2014 12:44 pm
      School: Appalachian State
      Has thanked: 926 times
      Been thanked: 679 times

      Re: Next phase campus transformation

      Unread post by HighlandsApp » Thu May 19, 2022 10:09 am

      beav910 wrote:
      Thu May 19, 2022 8:49 am
      I also see they've got a renovation planned for Wey Hall. Holy sh*t it needed it. That's where most of my classes were and it was pretty much a dump but I loved it. 15 million to do it is pretty crazy though. Interested to see how it turns out.
      It's amazing we've never been able to get funding to renovate some of these buildings. The North Carolina legislature wouldn't give us the money to renovate Samford and the school had to borrow money and then initiate a student feed to tack on every semester to pay the debt. Edwin Duncan is being renovated it's never been renovated and it's 60 years. Way Hall is 50 years old and it's never been renovated. IG Greer is a train wreck and I believe likely a demo project. During the Edwin Duncan Reno, the offices are going to be relocated to East Dorm. AppState's been underfunded by the legislature for way way way way way too long...

      HighlandsApp
      Posts: 1297
      Joined: Tue Apr 01, 2014 12:44 pm
      School: Appalachian State
      Has thanked: 926 times
      Been thanked: 679 times

      Re: Next phase campus transformation

      Unread post by HighlandsApp » Thu May 19, 2022 10:56 am

      Looks like the bookstore is going to borrow some money to do some renovations too. Looks pretty nice:

      https://www.appstate.edu/appalachians-f ... bookstore/

      User avatar
      beav910
      Posts: 511
      Joined: Wed Dec 17, 2014 9:13 pm
      School: Appalachian State
      Has thanked: 76 times
      Been thanked: 162 times

      Re: Next phase campus transformation

      Unread post by beav910 » Thu May 19, 2022 11:14 am

      HighlandsApp wrote:
      Thu May 19, 2022 10:09 am
      beav910 wrote:
      Thu May 19, 2022 8:49 am
      I also see they've got a renovation planned for Wey Hall. Holy sh*t it needed it. That's where most of my classes were and it was pretty much a dump but I loved it. 15 million to do it is pretty crazy though. Interested to see how it turns out.
      It's amazing we've never been able to get funding to renovate some of these buildings. The North Carolina legislature wouldn't give us the money to renovate Samford and the school had to borrow money and then initiate a student feed to tack on every semester to pay the debt. Edwin Duncan is being renovated it's never been renovated and it's 60 years. Way Hall is 50 years old and it's never been renovated. IG Greer is a train wreck and I believe likely a demo project. During the Edwin Duncan Reno, the offices are going to be relocated to East Dorm. AppState's been underfunded by the legislature for way way way way way too long...
      Agreed. I can't speak on the other buildings but I remember professors in 2018 saying the Wey Hall renovation has been in the works forever because they couldn't get funding and even then the building isn't really made for what it's used for. I think it used to house WASU back in the day.
      Appalachian State Alumnus :: Graphic Designer

      User avatar
      proasu89
      Posts: 1695
      Joined: Fri Aug 10, 2012 7:33 am
      School: Appalachian State
      Has thanked: 911 times
      Been thanked: 754 times

      Re: Next phase campus transformation

      Unread post by proasu89 » Thu May 19, 2022 11:58 am

      beav910 wrote:
      Thu May 19, 2022 11:14 am
      HighlandsApp wrote:
      Thu May 19, 2022 10:09 am
      beav910 wrote:
      Thu May 19, 2022 8:49 am
      I also see they've got a renovation planned for Wey Hall. Holy sh*t it needed it. That's where most of my classes were and it was pretty much a dump but I loved it. 15 million to do it is pretty crazy though. Interested to see how it turns out.
      It's amazing we've never been able to get funding to renovate some of these buildings. The North Carolina legislature wouldn't give us the money to renovate Samford and the school had to borrow money and then initiate a student feed to tack on every semester to pay the debt. Edwin Duncan is being renovated it's never been renovated and it's 60 years. Way Hall is 50 years old and it's never been renovated. IG Greer is a train wreck and I believe likely a demo project. During the Edwin Duncan Reno, the offices are going to be relocated to East Dorm. AppState's been underfunded by the legislature for way way way way way too long...
      Agreed. I can't speak on the other buildings but I remember professors in 2018 saying the Wey Hall renovation has been in the works forever because they couldn't get funding and even then the building isn't really made for what it's used for. I think it used to house WASU back in the day.
      3rd floor Wey back in the day.

      User avatar
      firemoose
      Posts: 8019
      Joined: Sat Feb 18, 2012 3:20 am
      School: Appalachian State
      Location: Boone, NC
      Has thanked: 865 times
      Been thanked: 3646 times

      Re: Next phase campus transformation

      Unread post by firemoose » Wed Jun 22, 2022 11:32 pm


      The Rock
      Posts: 1786
      Joined: Thu Sep 25, 2014 7:11 pm
      School: Appalachian State
      Has thanked: 95 times
      Been thanked: 846 times

      Re: Next phase campus transformation

      Unread post by The Rock » Thu Jun 23, 2022 7:07 am

      look for some building to start at old broyhill property soon too

      User avatar
      beav910
      Posts: 511
      Joined: Wed Dec 17, 2014 9:13 pm
      School: Appalachian State
      Has thanked: 76 times
      Been thanked: 162 times

      Re: Next phase campus transformation

      Unread post by beav910 » Thu Jun 23, 2022 9:16 am

      The Rock wrote:
      Thu Jun 23, 2022 7:07 am
      look for some building to start at old broyhill property soon too
      What's the plan for that area?
      Appalachian State Alumnus :: Graphic Designer

      HighlandsApp
      Posts: 1297
      Joined: Tue Apr 01, 2014 12:44 pm
      School: Appalachian State
      Has thanked: 926 times
      Been thanked: 679 times

      Re: Next phase campus transformation

      Unread post by HighlandsApp » Thu Jun 23, 2022 10:40 am

      beav910 wrote:
      Thu Jun 23, 2022 9:16 am
      The Rock wrote:
      Thu Jun 23, 2022 7:07 am
      look for some building to start at old broyhill property soon too
      What's the plan for that area?
      https://today.appstate.edu/2022/03/25/i ... n-district

      https://www.appstate.edu/appalachians-f ... servatory/

      mike87
      Posts: 1266
      Joined: Tue Sep 01, 2015 8:55 pm
      School: Appalachian State
      Has thanked: 1270 times
      Been thanked: 1068 times

      Re: Next phase campus transformation

      Unread post by mike87 » Thu Jun 23, 2022 1:12 pm

      We seem to be pretty adept at building solar cars. That should somehow track into Biodiversity.